Part of the 2022 Sinking Fund Project is a complete resurface of the floor of the high school gym. The picture above is a shop drawing provided to us by Baseman Bros. Inc. I think it looks pretty sharp!

Gym Floor Layout
JUN 22, 2022
JUN 22, 2022
Part of the 2022 Sinking Fund Project is a complete resurface of the floor of the high school gym. The picture above is a shop drawing provided to us by Baseman Bros. Inc. I think it looks pretty sharp!